How to calculate ILI, step by step
A worked ILI calculation: build the water balance, find the four UARL inputs and check the result with a practical network example.
Utilities have not always used the same definitions for water losses. For example, firefighting and meter errors could be included in different categories, making comparisons difficult.
The International Water Association (IWA) and American Water Works Association (AWWA) established a common framework. It separates authorised use from apparent and real losses, so utilities can account for water consistently.
The balance also provides the annual real-loss volume used in the Infrastructure Leakage Index (ILI). ILI compares this with estimated unavoidable annual real losses, which requires network and pressure data. The EU Drinking Water Directive allows ILI or another appropriate method for assessing leakage.
The key point: a balance that adds up is not proof that its inputs are correct. In a top-down water balance, real losses are calculated as the remainder.
| System input volume | Authorised consumption | Billed authorised consumption | Billed metered consumption (incl. water exported) | Revenue water |
| Billed unmetered consumption | ||||
| Unbilled authorised consumption | Unbilled metered consumption | Non-revenue water | ||
| Unbilled unmetered consumption | ||||
| Water losses | Apparent losses | Unauthorised consumption | ||
| Customer metering inaccuracies and data-handling errors | ||||
| Real losses | Leakage on transmission and distribution mains | |||
| Leakage and overflows at storage tanks | ||||
| Leakage on service connections up to the point of customer metering |
The two main calculations are:
Water losses = System input volume − Authorised consumption
Real losses = Water losses − Apparent losses
NRW includes leakage, but also authorised unbilled use and losses caused by metering or data errors. It should not be reported as leakage alone.
System input volume is all water entering the defined system during the reporting period, including water from the utility’s own production and imports. For a distribution-system balance, use water entering the network after treatment, not raw water abstracted upstream.
Define the boundary first and account for every inlet. In the table above, billed metered exports are included in authorised consumption. Do not also subtract them from input. If you use a balance that excludes exports, adjust the boundary and calculations consistently.
Check bulk-meter accuracy and use the same period for all volumes. With other inputs unchanged, a 2% error in system input changes calculated real losses by 2% of the input volume.
Authorised consumption is water used with the utility’s permission. It has four components:
Document these estimates. Leaving unbilled use at zero without evidence can overstate real losses.
Apparent losses are unauthorised use and consumption missed or incorrectly recorded by customer meters and data systems. The table groups them into two components:
Apparent losses can reduce billing revenue. They are generally valued using the applicable customer tariff, while real losses are generally valued using the cost of producing or purchasing water. Recoverable revenue depends on tariffs and whether the consumption can be billed.
Mechanical meters can under-register as they wear, particularly at low flow. Age alone does not establish the error: test a representative sample of the meter fleet.
Real losses are water physically lost from the system:
This is an accounting boundary. It does not, by itself, determine who owns the pipe or must repair it.
In a top-down balance, real losses are calculated by subtraction:
Real losses = System input volume − Authorised consumption − Apparent losses
With all other inputs unchanged, the effect on the calculated result is:
Errors in input volume, authorised consumption or apparent losses affect the calculated remainder. They can increase or decrease the estimate, and some may cancel out. A total that adds up does not detect these errors; negative losses or implausible trends can still flag a problem.
Check the data quality and compare the result with an independent leakage estimate before using it to plan work.
Minimum night flow is one useful check in a metered zone. Demand is often lowest around 02:00–04:00, but the timing and level depend on local users.
Start with net zone inflow, accounting for outlets and changes in storage. Subtract customer night use, including households, industry and tank filling. Closed-loop circulation inside a building does not itself consume supply water. The remainder estimates leakage at night, not annual leakage volume.
To compare it with the water balance, convert it to a volume for the same area and period, allowing for pressure changes and changes in leakage over time. A large difference calls for checking both methods: meters, boundaries, night-use assumptions and pressure adjustments.
Record the source and uncertainty of each volume. Measured values also need checks:
| Cell | Typically |
|---|---|
| System input volume | Measured; verify bulk-meter accuracy |
| Billed metered consumption | Measured; test for under-registration |
| Billed unmetered consumption | Estimated; document the basis |
| Unbilled metered consumption | Measured; collect all relevant records |
| Unbilled unmetered consumption | Estimated; document activities and volumes |
| Unauthorised consumption | Estimated; record assumptions and evidence |
| Meter inaccuracies and data-handling errors | Estimated from meter tests and data checks |
| Real losses | Calculated remainder; affected by uncertainty in the inputs |
Weak estimates can leave substantial uncertainty in real losses. Report that uncertainty and prioritise improvements by their likely effect on the result, not just by the size of a component.
Start with a clear system boundary and a common reporting period. Verify bulk meters, record unbilled use and test customer meters. Where practical, divide the network into metered zones so you can investigate differences locally.
Divako water loss management brings input readings, consumption data and network zones together. It helps validate readings, align periods and update calculations as data arrives. Estimates still need evidence and review.

A worked ILI calculation: build the water balance, find the four UARL inputs and check the result with a practical network example.

The Drinking Water Directive names ILI as the method for assessing leakage. What the index is, how UARL is calculated, a worked example, and the systems where it does not apply.

Every water network loses water – the question is how much, and where. With the EU's Drinking Water Directive turning leakage into a reportable number, the water balance is moving from an annual estimate to an operational tool.